Why It Matters

The Marine Minerals Administration (MMA) has proposed updating industry standards governing oil, gas and sulfur operations on the Outer Continental Shelf, introducing new equipment safety and maintenance requirements. ​

The agency argues the changes would improve operational safety and measurement accuracy without adding costs because the industry already uses the proposed standards. For lobbyists representing offshore energy companies, equipment manufacturers and engineering firms, the comment period provides an opportunity to identify discrepancies between existing industry practices and proposed federal requirements.

What Would Change

The proposal would introduce several new or revised compliance requirements:

  • Pipeline safety: Updated shutdown valve requirements would require boarding shutdown valves to meet an industry fire-resistance qualification standard.
  • Equipment repairs: Revised atmospheric vessel regulations would require repairs to follow American Petroleum Institute standards or equivalent recognized engineering practices.
  • Production measurement: Updated hydrocarbon measurement requirements would replace a withdrawn industry standard with revised requirements for metering system design, selection and operation.
  • Crane operations: Revised offshore crane regulations would incorporate additional training standards for riggers, operators and inspectors. Existing cranes generally would not require reevaluation under the updated equipment specifications.
  • Well safety: Updated casing pressure management requirements would incorporate a newer industry standard.

Although the MMA anticipates no additional industry costs, the new fire-resistance and atmospheric vessel repair requirements warrant particular attention because existing regulations do not explicitly impose those obligations.

The Lobbying

Woodside Energy (USA) Inc. reported $140,000 in lobbying expenditures during each of the first three quarters, totaling $420,000 across filings addressing offshore oil and gas issues.

Equinor US Operations LLC reported $110,000 per quarter during the same period, totaling $330,000 across filings addressing upstream oil and gas operations and offshore energy.

Advertisement

Which other energy companies and industry associations are lobbying on offshore operations? Explore additional lobbying disclosures on Legis1.

What Next

Offshore energy companies and equipment manufacturers have until Dec. 24, 2026, to submit comments. Lobbyists should work with clients to evaluate:

  • Equipment testing and replacement costs associated with new fire-resistance standards.
  • Potential expenses resulting from revised vessel repair requirements.
  • Additional training obligations for offshore crane personnel.
  • Whether implementation periods or exemptions are necessary for existing equipment.

This proposal is separate from an earlier standards update that took effect Aug. 10. Comments can be submitted through Regulations.gov, referencing docket MMA-2026-0166. The proposed requirements are not yet binding, and the agency has not announced a final rule publication date.

Track offshore energy regulations, industry lobbying and upcoming federal rulemaking on Legis1.

Access the Legis1 platform for comprehensive political news, data, and insights.

Spot something wrong? Report an issue with this article