What Changes

The Environmental Protection Agency (EPA) proposes to approve Oregon's revised vapor recovery rules for gasoline dispensing facilities (GDFs) in the Portland and Salem/Keizer ozone maintenance areas, with comments due December 14. ​

The Oregon Department of Environmental Quality (ODEQ) submitted the State Implementation Plan (SIP) revision on December 17, 2025, covering Oregon's Division 244 and Division 216 rules.

The December 14 comment deadline is the sole opportunity to shape the terms before EPA Region 10 issues a final approval.

Impacts On Existing Law

The proposal would remove the SIP requirement for Stage II vapor recovery systems at GDFs and replace it with Stage I Enhanced Vapor Recovery (EVR), Stage I vapor balance systems, and enhanced conventional nozzles, depending on a facility's location, equipment type, and annual throughput.

The existing SIP obligation to install and maintain Stage II equipment would be eliminated; the proposed text substitutes tiered Stage I controls keyed to throughput and tank type.

No codified CFR amendatory text is listed in the proposal; EPA would incorporate Oregon's Division 244 and Division 216 rules by reference into 40 CFR Part 52.

Advertisement

Who's Affected

GDFs with throughput of one million gallons per year or more must decommission Stage II equipment and install Stage I EVR and enhanced conventional nozzles by 2030. GDFs with throughput between 120,000 and one million gallons per year face new Stage I requirements triggered by tank replacement. New installations would no longer be required to install Stage II systems.

Who's Lobbying

EPA Region 10 issued the proposed rule under docket EPA-R10-OAR-2026-2972 (91 FR 73193, document number 2026-23124). No 2026 lobbying disclosure filing addresses Oregon vapor recovery requirements or this SIP revision directly. Aarti Industries Ltd. reported $80,000 in third-quarter lobbying on "issues regarding seeking tariff assistance for the import of a gasoline additive." Vapor Technology Association Inc. reported $20,000 in third-quarter lobbying on "issues relating to the regulation of vapor products." Neither filing names gasoline dispensing emission standards or the Oregon revision.

Next Steps

The proposal, published November 13 as 91 FR 73193, is not binding. The comment window opened November 13 and closes December 14, and late comments are not accepted before a final rule is drafted.

Access the Legis1 platform for comprehensive political news, data, and insights.

Spot something wrong? Report an issue with this article